650-059 Premium Bundle

650-059 Premium Bundle

LCSARS Cisco Lifecycle Services Advanced Routing and Switching Certification Exam

4.5 
(39825 ratings)
0 QuestionsPractice Tests
0 PDFPrint version
November 21, 2024Last update

Cisco 650-059 Free Practice Questions

P.S. Real 650-059 testing engine are available on Google Drive, GET MORE: https://drive.google.com/open?id=1cG5YkQOEnI9Jhzqan9xwrJNT7m15Jfvd


New Cisco 650-059 Exam Dumps Collection (Question 2 - Question 11)

Q1. Which of these best describes the actions you would take during the staging plan development service component within the desin phase?

A. help improve the infrastructure security system of the customer

B. assess the abiliy of he site facilities to accommodate the proposed ifrastructure.

C. help improve the performance and functionality of the infrastructure operations and network management system.

D. develop and execute proof-of-concept tests, validate the infrastructure high-level design, and identify any design anhancements.

E. provide a step-by-step plan detailing the instalation and service-commision reqiurement task to be executed in a controlled implementaion environment that emulates a customer network.

Answer: E


Q2. Define procedures to manage access to all systems is an activity that is part of which service component in the operate phase?

A. security administration

B. systems monitoring

C. servce review

D. problem management

Answer: A


Q3. What is primary objective of the security architecture assessment?

A. create e design specification dcument

B. document the customer`s current and future technology projects

C. integrate routing and switching into the existing security architecture to protect networks and information against intruders

D. document power and UPS availability

Answer: C


Q4. Which of these correctly identifies the six phases of the cisco lifecycles framework?

A. prepare, plan, design, operate, and migrate

B. prepare, plan, create, implement, operate, and improve

C. prepare, plan design, implement, operate, and migrate

D. prepare, plan design, implement, operate and optimize

Answer: D


Q5. Which activity is a part of the technology assessment service component in the optimize phase?

A. develop the escalation plan

B. execute test cases

C. develop the project plan

D. measure the solution performance, availability, capacity, and software functionality

Answer: D


Q6. During which service component in the optimize phase would you assess the network for vulnerabilities, in order to reduce the risk of attacks?

A. change management

B. security assessment

C. operations readiness assessment

D. oprations assessment

E. technology assessment

Answer: B


Q7. Which of these best describes the actions you would take during the configuration management service component?

A. check whether changes in the infrastructure have been recorded correctly and monitors the status of the components to help ensure anaccurate picture of the network.

B. monitor, manage, and report on service-level metrics and abnormal eventsor trends that may adversely affect the availability, capacity, performance, or security of the enterprise routing and switching system.

A. C. identify and solve recurring incidents by analyzing incident trends to identify patterns and systemic conditions.

D. standartize methods and procedures for authorizing, documenting, and performing changes to a routing and switching system.

Answer: A


Q8. Which of these best describes the actions you would take during the business requirements development service component in the prepare phase?

A. analyze the customer`s business requirements for a new solution.

B. analyze the customer`s ongoing business case requirements

C. determine the customer`s technology requirements.

D. determine the appropriate cooling temperature for the customer`s server room.

Answer: A


Q9. In which phase is a system acceptance test plan developed and documented

A. design

B. prepare

C. operate

D. implement

Answer: A


Q10. Which two service components are performed during the implement phase? (choose two)

A. site readiness specification

B. staging

C. phased implementation

D. security readiness assessment

E. configuration management

Answer: B,C


100% Replace Cisco 650-059 Questions & Answers shared by Surepassexam, Get HERE: https://www.surepassexam.com/650-059-exam-dumps.html (New 50 Q&As)


START 650-059 EXAM