Q2. Which solution will allow remote engineering support for trouble or fault analysis?
A. remote engineering access (VPN)
B. network security
C. physical access control
D. network security
Answer: A
Q3. Which part of the sales cycle is not supported by the Smart Grid PDI Help Desk?
A. planning
B. design
C. operation
D. implementation
Answer: C
Q4. Which option is NOT one of the business drivers behind trends in the Global Energy Market?
A. Cost of doing business
B. Aging infrastructure and workforce
C. Changing Grid Architecture
D. Global warming
A. E. New Consumer Interaction Model
Answer: E
Q5. Which two data flows are used with Substation Automation with GOOSE?
A. IED RTU and IED MU
B. IED IED and IED RTU
C. IEDMU and IED IED
D. IED HMI and IED IED
Answer: A
Q6. How many power supply slots are available on each Cisco CGR 2010 chassis?
A. 1 slot
B. 4 slots
C. 2 slots
D. No slots because all power is integrated over IP.
Answer: C
Q7. What is the correct time delay for a critical GOOSE Type-1 message?
A. There is no specific time delay requirement.
B. Fewer than 10 ms
C. Less than 4 to 7 s
D. Less than 3 to 10ms
Answer: D
Q8. Which of the following models supports Power over Ethernet?
A. CGS-2520-24TC
B. CGS-2520-16S-8PC
C. All CGS models
D. None of the model supports POE
Answer: B
Q9. Which section of NERC-CIP specifies physical security requirements?
A. section 3
B. section 7
C. section 6
D. section 4
E. section 5
Answer: C
Q10. Which product(s) are included in the first Cisco Smart Grid product offerings?
A. all existing Cisco products
B. Cisco Smart Grid 3000 ruggedized switching platform
C. Cisco Connected Grid Router 2010 and Connected Grid Switch 2520
D. ISR 2900 series and Catalyst 2960
Answer: C
Q11. Which trend is driving the move toward Smart Grid?
A. increases in supply, which requires the integration of distributed generation sources
B. increasing carbon footprint
C. compliance with regulations involving government funding and rules
D. reduced demand, which causes an increase in demand and peak load
Answer: C