HPE0-S58 Premium Bundle

HPE0-S58 Premium Bundle

Implementing HPE Composable Infrastructure Solutions Certification Exam

4.5 
(50880 ratings)
0 QuestionsPractice Tests
0 PDFPrint version
November 21, 2024Last update

HP HPE0-S58 Free Practice Questions

Testking HPE0-S58 Questions are updated and all HPE0-S58 answers are verified by experts. Once you have completely prepared with our HPE0-S58 exam prep kits you will be ready for the real HPE0-S58 exam without a problem. We have Latest HP HPE0-S58 dumps study guide. PASSED HPE0-S58 First attempt! Here What I Did.

Free HPE0-S58 Demo Online For HP Certifitcation:

NEW QUESTION 1
An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs.
What is the most efficient method the integrator can use to add a new VLAN to each connection?

  • A. Add the new VLAN to the network set configured in the profile template, and update the server profile from the template
  • B. Add the new VLAN under Edit server profile connections
  • C. Add the new VLAN to the network set configured in the profile template
  • D. Add the new VLAN under Edit server profile connections in the profile template, and update the server profile from the template

Answer: A

NEW QUESTION 2
Using a two-port FLM, what is the minimum number of frames needed to implement a solution that includes redundant Composers and Image Streamers?

  • A. 1
  • B. 2
  • C. 3
  • D. 4

Answer: C

NEW QUESTION 3
Refer to the exhibit.
HPE0-S58 dumps exhibit
A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.
What is the maximum number of compute nodes that the customer’s fabric could support?

  • A. 24
  • B. 36
  • C. 48
  • D. 60

Answer: D

NEW QUESTION 4
What does the hypervisor cluster profile feature of HPE OneView enable the integrator to accomplish?

  • A. configure a DRS cluster that provides load balancing functionality
  • B. enable Adaptive Optimization using SSMC that will optimize VM location
  • C. enable load balancing policies for the most important VMs using vCenter Server and traffic shaping policies
  • D. use the CPU affinity option to improve CPU scheduling

Answer: A

NEW QUESTION 5
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)

  • A. assignment of IP addresses for NICs in an operating system
  • B. assignment of IP addresses for Composer appliances
  • C. assignment of IP addresses for PXE booting to a deployment server
  • D. assignment of IP addresses for interconnect modules
  • E. assignment of IP addresses for iLOs

Answer: DE

Explanation:
References: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html

NEW QUESTION 6
A customer needs to significantly improve I/O performance to a database server.
Which product should an integrator implement as part of a Synergy composable solution?

  • A. HPE Synergy D3940 storage module with SSD drives
  • B. HPE Composer with NVMe drives
  • C. HPE Synergy compute module with a Tesla accelerator
  • D. HPE Synergy Image Streamer

Answer: A

NEW QUESTION 7
A customer is planning to deploy OneView for vCenter Server to improve management procedures for growing virtualization environment. The customer is concerned about resources required by HPE OneView for vCenter Server.
Which statement about deploying HPE OneView for vCenter Server is true?

  • A. It is deployed as an application on the Windows Server machine with at least 48GB of memory.
  • B. It is deployed as a part of the HPE Composer installation.
  • C. It is deployed as a virtual machine on the supported hypervisor.
  • D. It can only be deployed if HPE Global Dashboard is already installed.

Answer: C

NEW QUESTION 8
A customer needs to deploy additional management components, such as vCenter Server and HPE Global Dashboard.
According to HPE best practices, how should an integrator deploy these components?

  • A. Deploy VMware HA cluster on two dedicated management servers, then deploy management components to this cluster.
  • B. Deploy vCenter Server as a virtual machine on the Hyper-V host and HPE Global Dashboard to the domain controller.
  • C. Install vCenter Server on the domain controller, then deploy HPE Global Dashboard to the HPE Composer or HPE OneView appliance.
  • D. Deploy vCenter Server to any Windows machine, and install HPE Global Dashboard on the same server.

Answer: B

NEW QUESTION 9
A customer using HPE Synergy is unable to access certain VLANs from a single NIC port of a compute module.
Which configuration option in the server profile needs to be verified to ensure that the server profile has the correct configuration?

  • A. multiple Networks are assigned to the connection
  • B. multiple VLAN checkbox is selected
  • C. VxLAN has not been enabled
  • D. assigned Network Set includes all needed VLANs

Answer: D

NEW QUESTION 10
Which HPE Synergy D3940 storage module configuration is valid?

  • A. a single RAID set to be shared across the SAS fabric to multiple compute nodes as a virtualization host datastore
  • B. maximum of three HPE Synergy D3940 storage modules per frame to be used by any compute module within the management ring
  • C. any number of the drives from storage module to be mapped to any single compute node
  • D. a pair of disks to house Composer backups and Synergy firmware bundles

Answer: A

NEW QUESTION 11
Which storage solution can be used for volume provisioning using HPE Composer?

  • A. MSA 2040
  • B. HPE StoreEasy 1560
  • C. HPE 3PAR StoreServ
  • D. HPE XP7 Storage

Answer: C

Explanation:
References: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf

NEW QUESTION 12
During a first-time installation of HPE Synergy, an external monitor is not available to the integrator. Which approach should the integrator take to perform the first-time setup?

  • A. Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
  • B. Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
  • C. Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
  • D. Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).

Answer: B

NEW QUESTION 13
A customer has the following HPE Synergy solution:
HPE0-S58 dumps exhibit three Synergy frames
HPE0-S58 dumps exhibit two HPE Virtual Connect SE 32Gb Fibre Channel (FC) modules in each time
HPE0-S58 dumps exhibit two HPE Virtual Connect SE 40GB F8 modules
HPE0-S58 dumps exhibit four HPE Synergy 10Gb Interconnect Link Modules
Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
References: https://h20215.www2.hpe.com/v2/GetPDF.aspx/c04815258.pdf

NEW QUESTION 14
In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections?

  • A. one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)
  • B. two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)
  • C. one Image Streamer module in each Synergy frame (3 total)
  • D. two Image Streamer modules in frame 1 (2 total)

Answer: B

NEW QUESTION 15
A customer needs to attach 20 HPE 1 TB SATA 6G SFF hard drives to an HPE Synergy 480 Gen10 compute module.
Which HPE products are necessary to meet the requirements? (Choose three.)

  • A. HPE D3940 storage module
  • B. HPE Synergy 12Gb SAS Connection Module
  • C. HPE 10GbE SynergyPass-Thru Module
  • D. HPE Smart Array P416ie-m Controller
  • E. HPE Smart Array P542D Controller

Answer: BDE

NEW QUESTION 16
How many redundant fabrics are supported in an HPE Synergy frame?

  • A. 1
  • B. 2
  • C. 3
  • D. 4

Answer: C

Explanation:
References: https://h20215.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf (2)

NEW QUESTION 17
Which management tool required by HPE Infosight must be deployed at the customer site?

  • A. HPE Global Dashboard
  • B. HPE OneView
  • C. HPE iLO Amplifier
  • D. HPE StoreServ Management Console (SSMC)

Answer: C

NEW QUESTION 18
Refer to the exhibit.
HPE0-S58 dumps exhibit
How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?

  • A. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
  • B. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
  • C. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
  • D. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.

Answer: C

NEW QUESTION 19
A customer is unable to boot to a 3.5TB volume created and presented to a compute node. What is likely preventing the boot?

  • A. The system is set to UEFI instead of Legacy Boot mode
  • B. The system is set to Legacy Boot mode instead of UEFI
  • C. Boot volumes larger than 2.2TB are not supported on Synergy
  • D. Boot volumes larger than 3TB are not supported on HPE Synergy

Answer: B

Explanation:
References: https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-c05351907

NEW QUESTION 20
A customer requires all automated Fibre Channel zones to have a prefix of “SYNERGY” in the automatically-generated zones.
Click where the integrator should change the naming policy.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
HPE0-S58 dumps exhibit

NEW QUESTION 21
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?

  • A. Enable Remote Support and Insight Online Integration in the Composer UI
  • B. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
  • C. Configure OneView with iLO Amplifier pack
  • D. Activate iLO Federation on all installed compute nodes

Answer: C

NEW QUESTION 22
What is the purpose of the OmniStack Accelerator card installed in HPE SimpliVity platform?

  • A. It performs inline data efficiency processing and deduplication
  • B. It provides very fast SSD capacity for demanding workloads
  • C. It provides graphic acceleration for VDI infrastructure
  • D. It accelerates CPU processing within a virtual machine

Answer: B

Explanation:
References:
https://assets.ext.hpe.com/is/content/hpedam/documents/a00026000-6999/a00026728/a00026728enw.pdf

NEW QUESTION 23
A customer has two Synergy frames using HPE Virtual Connect and 20Gb satellite modules linked together. What is the maximum number of frames that can be added to this configuration? (Note: Enter your answer in the answer field below.)

  • A. 3

Answer: A

Explanation:
\ 3 (three) frames maximum

NEW QUESTION 24
Refer to the exhibit.
HPE0-S58 dumps exhibit
An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.
What is the likely cause of this issue?

  • A. FCoE capable interconnect modules are not installed in the Synergy frame
  • B. Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
  • C. A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
  • D. The FCoE connection has not been added as a Fibre Channel connection within a server profile

Answer: D

NEW QUESTION 25
......

Recommend!! Get the Full HPE0-S58 dumps in VCE and PDF From 2passeasy, Welcome to Download: https://www.2passeasy.com/dumps/HPE0-S58/ (New 97 Q&As Version)


START HPE0-S58 EXAM